Watling JCB Ltd, a leading name in the plant hire industry, identified a need to modernise and improve the efficiency of its air conditioning systems across several UK locations. In line with their ongoing commitment to sustainability and operational cost reduction, Watling JCB turned to long-standing service partner Airway Group to provide advanced, energy-efficient HVAC solutions tailored to the needs of each site.
The Challenge
Each site presented its own unique set of requirements:
Hereford: The primary objective was to implement a fuel-efficient heating and cooling system for the office and reception areas—spaces crucial for daily operations and customer-facing interactions.
West Bromwich & Stoke: These sites had faulty and outdated A/C units that were not only inefficient but also costly to maintain. Watling JCB sought a modern solution that would provide reliable performance and energy savings.
The Solution
Airway Group proposed and installed Mitsubishi Electric R32 Air Conditioning Systems, which are known for their superior efficiency and environmental performance. The installations also included all necessary electrical adaptations to ensure compatibility and optimise system functionality.
Key highlights of the solution included:
Use of A++ energy-rated equipment, providing significant savings in long-term energy costs.
Replacement of non-functional units with modern, sleek systems that enhance the aesthetic of the workspaces.
Fully managed installation process with minimal disruption to day-to-day operations.
Why Airway Group?
Watling JCB chose to continue their relationship with Airway Group due to the provider’s consistent track record. Airway Group already managed and maintained HVAC systems across several Watling JCB sites and had established a trusted rapport with the client.
Results & Impact
Improved Energy Efficiency: New systems boast A++ energy ratings, leading to noticeable reductions in power consumption and operating costs.
Enhanced Comfort: Upgraded climate control improves comfort for staff and visitors alike, especially in high-traffic areas such as offices and reception.
Modernisation: Replacing faulty, outdated equipment has refreshed the overall look and functionality of interior environments.
Ongoing Reliability: The installations are backed by Airway Group’s ongoing maintenance and support, ensuring long-term reliability and performance.